National Green Tribunal Sunil Kumar Samanta vs West Bengal Pcb Ors on 24 July, 2014
BEFORE THE NATIONAL GREEN TRIBUNAL
PRINCIPAL BENCH
NEW DELHI
…………..
M.A. NO. 573 OF 2013
IN
APPEAL NO. 67 OF 2013
In the matter of:
Sunil Kumar Samanta
M/s. Samanta Engineering Works,
1, B.T. Road, Barrackpore,
North 24-Parganas,
West Bengal
…..Appellants
Versus
1 West Bengal Pollution Control Board,
Paribesh Bhawan,
10-A, Block-LA, Sector – III,
Salt Lake, Kolkata – 700 098
2 Chief Scientist
West Bengal Pollution Control Board,
Paribesh Bhawan,
10-A, Block-LA, Sector – III,
Salt Lake, Kolkata – 700 098
3 Senior Environmental Engineer
West Bengal Pollution Control Board,
Kalyani Expressway, Panpur More,
P.O. Narayanpur, Kankinara
District North 24 Parganas – 743 126
4 Environmental Engineer
West Bengal Pollution Control Board,
Kalyani Expressway, Panpur More,
P.O. Narayanpur, Kankinara
District North 24 Parganas – 743 126
1
5 The Pollution Control Appellate Authority (West Bengal)
Paribesh Bhawan,
10-A, Block-LA, Sector – III,
Salt Lake, Kolkata – 700 098
6 Government of West Bengal
Through the Secretary
Ministry of Transport
Writer’s Building
Kolkata – 700 001
…….Respondents
Counsel for Appellant:
Mr. Jayant K. Mehta with Ms. Kanchan Yadav, Advocates
Counsel for Respondent:
Mr. Amit Agrawal, Advocate for Respondents 1 to 5 Mr. Sachin Das and Mr. Bikas Kar Gupta, Advocate for Respondent No. 6
JUDGMENT
PRESENT:
Hon’ble Mr. Justice Swatanter Kumar (Chairperson) Hon’ble Mr. Justice M.S. Nambiar (Judicial Member) Hon’ble Dr. D.K. Agrawal (Expert Member) Hon’ble Prof. A.R. Yousuf (Expert Member) Hon’ble Dr. R.C.Trivedi (Expert Member)
Dated: July 24, 2014
JUSTICE SWATANTER KUMAR, (CHAIRPERSON)
The present appeal is preferred against the order dated 10th
April, 2012 passed by the Pollution Control Appellate Authority,
West Bengal (for short ‘appellate authority’), upholding the order
2
of closure passed by the West Bengal Pollution Control Board (for
short ‘the Board’) dated 8th February, 2012.
2. The necessary facts are that the appellant is the sole
proprietor of M/s. Samanta Engineering Works, which is inter alia
engaged in the business of running an Auto Emission Testing
Centre situated at 1, B.T. Road, Barrackpore, North 24-Parganas,
West Bengal. The said Auto Emission Testing Centre checks
motor vehicles including two wheelers for emission of smoke
within permissible limits of pollution, as per the prescribed
norms. Licensing Authority under the relevant rules is the District
Magistrate, North 24-Paraganas, Barasat, West Bengal. The
appellant had made an application for Letter of Offer for
establishment of an Auto Emission Testing Centre before the
Licensing Authority. In furtherance to which, the Licensing
Authority vide its memo dated 8th February, 2005 called upon the
Board to conduct an enquiry and to submit a report. According to
the appellant, being satisfied, the consent to operate was issued
by the Board and the Licensing Authority also permitted the
appellant to operate. Two different licenses for operating the Auto
Emission Testing Centre were issued. These licenses were valid for
a period of one year. The appellant applied for the renewal of said
licenses in the prescribed format. Vide memo dated 10th March,
2011, the Board informed the appellant that their unit will be
inspected on that very date. The inspection was carried out in
relation to the instruments used for testing vehicles and/or two
3
wheelers. According to the appellant, the said inspection was
satisfactory. In furtherance to the inspection dated 10th March,
2011, the appellant was called for a technical hearing to be
conducted at the head office of the respondent No. 1, where the
appellant brought to the notice of the officials that the copy of the
inspection report was not provided to the appellant as such. He
remained unaware about the contents thereof. Thereafter, vide
Memo dated 8th February, 2012, a closure order against the
appellant was issued by the Chief Scientist of the Board. Against
this order, the appellant preferred an appeal before the Appellate
Authority. The Appellate Authority in its order dated 10th April,
2012 noticed that during the inspection, it was found that:
1. RPM and oil temperature sensor were not functioning.
2. CO-correction software was not installed in the 4 –
gas analyzer software.
During inspection it was also found that Smoke Meter and
the 4-gas analyzer were operating unsatisfactorily.
3. In addition thereto, it was stated in the impugned order that
the unit was not possessed of any valid license in accordance with
the rules. The Appellate Authority, therefore, in its detailed order
dated 10th April, 2012, dismissed the appeal rejecting the
contentions raised by the appellant before it. Against the said
order dated 10th April, 2012, the appellant has preferred the
present appeal (Appeal No. 67 of 2013).
4
4. According to the appellant, this appeal is barred by 104
days. Thus, the appellant has filed a Miscellaneous Application
No. 573 of 2013 praying for condonation of delay of 104 days in
filing the present appeal. This application is opposed and
vehemently contested by the respondents, particularly the Board
on the ground that firstly, the appeal is hopelessly barred by 104
days and secondly, this Tribunal has no jurisdiction to condone or
even entertain the appeal when it is filed beyond a total period of
90 days i.e. 30+60 days in terms of proviso to Section 16 of the
National Green Tribunal Act, 2010 (for short the ‘NGT Act’). In
support of his second contention, the Learned Counsel has relied
upon two judgments of this Tribunal in the case of Nikunj
Developers & Others v. State Of Maharashtra & Anr. 2013, All
India NGT Reporter page 40 and Krishna Stone Crushers and
Others v. Haryana State Pollution Control Board and Another,
2014, All India NGT Reporter page 42.
5. On the other hand, the Learned Counsel appearing for the
appellant contended that these judgments of the Tribunal do not
lay down the correct law. It is contended that the provisions of the
Sections 4 to 24 of the Limitation Act, 1963 (for short the
‘Limitation Act’) would be applicable to the application filed by the
appellant, as the NGT Act does not expressly or impliedly exclude
the applicability of the Limitation Act as contemplated under
Section 29(2) of the Limitation Act. Further, it is contended that
the language of proviso to Section 16 of the NGT Act has not been
5
worded by the legislature in a manner so as to completely divest
the Tribunal from the jurisdiction of condoning of the delay
beyond a total period of 90 days provided under proviso to Section
16. To buttress these submissions, an argument has also been
advanced that this Tribunal being the first appellate judicial
forum, should construe the law of limitation liberally.
6. Before we proceed to examine the merit or otherwise of the
rival contentions raised before us, it is necessary for us to notice
certain further facts in relation to the filing of the present appeal
belatedly and for condonation of the delay.
7. The order of the Appellate Authority upholding the closure
order passed by the Board, was passed on 10th April, 2012. The
NGT Act had come into force on 2nd June, 2010. However, the
appellant initially did not prefer any appeal before the Tribunal
against the order of the Appellate Authority dated 10th April, 2012
but challenged the said order by filing a writ petition before the
High Court of Calcutta. The writ petition is stated to have been
filed on 17th May, 2012. The writ petition remained pending before
the High Court and by order dated 20th December, 2012, the
Board was asked to inspect the premises of the appellant as it
was the contention of the appellant that it had removed all the
defects. However, the writ petition of the appellant came to be
dismissed as withdrawn vide order dated 31st January, 2013. The
writ petition was withdrawn on the ground that the matter falls
6
within the ambit of Section 2(m) read with Section 14 of the NGT
Act and therefore, the appeal would lie to this Tribunal. The
certified copy of the order dated 31st January, 2013 was applied
for on 1st February, 2013, which was ready on 12th February,
2013 and was delivered on 13th February, 2013. The present
appeal was filed in the registry of the Tribunal at the Principal
Bench on 29th May, 2013. Here we may notice that originally the
appellant had filed Miscellaneous Application No. 487 of 2013 for
condonation of delay without specifying the days by which the
appeal was barred. On the very first day of hearing of the appeal
before the Tribunal, i.e. on 3rd June, 2013, the appellant had
sought permission to file a better affidavit in support of the
application of condonation of delay. This liberty was granted.
Thereafter, instead of filing additional affidavit, the appellant filed
Miscellaneous Application No. 573 of 2013 praying for
condonation of delay. Vide order dated 9th July, 2013 notice was
issued to the other parties in Miscellaneous Application No. 573 of
2013. According to this application, there was a delay of 104 days
in filing the present appeal. But, from the above narrated facts, it
is clear that the appeal before the Tribunal ought to have been
filed by 10th July, 2012, however, it has been filed on 29th May,
2013. There appears to be a delay of 323 days in filing the appeal.
Even, if the time spent by the appellant before the High Court of
Calcutta is excluded, the appeal would still be barred by 125
days.
7
8. From the above narrated factual matrix of the case it is
apparent that the present appeal has been filed beyond the outer
period of limitation i.e. 90 days as provided under proviso to
Section 16 of the NGT Act. Even if we take the case of the
appellant at its face value, then admittedly there is a delay of 104
days (which is in excess of the prescribed period of limitation).
However, upon proper computation there is in fact a delay of 125
days. If the period spent before the High Court and other period,
the exclusion of which is prayed for, is not excluded then the
appeal is barred by 323 days. Undisputedly, in any case the
appeal has been filed beyond 90 days which is the outer limit of
period of limitation prescribed under proviso to Section 16 of the
NGT Act.
It will be appropriate to refer to the relevant provisions
prescribing limitation under Section 16 of the NGT Act:
“Any person aggrieved by,–
(a) an order or decision, made, on or after the commencement of the National Green Tribunal Act, 2010, by the appellate authority under section 28 of the Water (Prevention and Control of Pollution) Act, 1974(6 of 1974);
(b) an order passed, on or after the commencement of the National Green Tribunal Act, 2010, by the State Government under section 29 of the Water (Prevention and Control of Pollution) Act, 1974(6 of 1974);
(c) directions issued, on or after the commencement of the National Green Tribunal Act, 2010, by a Board, under section 33A of the Water (Prevention and Control of Pollution) Act, 1974(6 of 1974);
8
(d) an order or decision made, on or after the commencement of the National Green Tribunal Act, 2010, by the appellate authority under section 13 of the Water (Prevention and Control of Pollution) Cess Act, 1977(36 of 1977);
(e) an order or decision made, on or after the commencement of the National Green Tribunal Act, 2010, by the State Government or other authority under section 2 of the Forest (Conservation) Act, 1980(69 of 1980);
(f) an order or decision, made, on or after the commencement of the National Green Tribunal Act, 2010, by the Appellate Authority under section 31 of the Air (Prevention and Control of Pollution) Act, 1981(14 of 1981);
(g) any direction issued, on or after the
commencement of the National Green Tribunal Act, 2010, under section 5 of the Environment
(Protection) Act, 1986(29 of 1986);
(h) an order made, on or after the commencement of the National Green Tribunal Act, 2010, granting environmental clearance in the area in which any industries, operations or processes or class of industries, operations and processes shall not be carried out or shall be carried out subject to certain safeguards under the Environment (Protection)Act, 1986(29 of 1986);
(i) an order made, on or after the commencement of the National Green Tribunal Act, 2010, refusing to grant environmental clearance for carrying out any activity or operation or process under the Environment (Protection) Act, 1986(29 of 1986); (j) any determination of benefit sharing or order made, on or after the commencement of the National Green Tribunal Act, 2010, by the National
Biodiversity Authority or a State Biodiversity Board under the provisions of the Biological Diversity Act, 2002(18 of 2003),
may, within a period of thirty days from the date on which the order or decision or direction or determination is communicated to him, prefer an appeal to the Tribunal:
Provided that the Tribunal may, if it is satisfied that the appellant was prevented by sufficient cause from filing the appeal within the said period, allow it to be
9
filed under this section within a further period not exceeding sixty days.”
9. A bare reading of the above provision shows that appeal as
contemplated under Section 16 against an order or decision or
direction or determination, has to be filed within 30 days from the
date on which the order is communicated to the aggrieved
persons. Proviso to Section 16 of the NGT Act provides for a
special limitation i.e. the appeal could be filed beyond the period
of 30 days within a further period not exceeding 60 days, upon
showing ‘sufficient cause’. This means the tribunal cannot allow
an appeal to be filed under Section 16 beyond a total period of 90
days. The NGT Act is a self-contained code as it provides for the
forum, procedure, limitation, functions and powers of the
tribunal. Furthermore, the scheme of the NGT Act, particularly,
with reference to the language of Section 16 of the NGT Act,
provides special limitation period. Thus, it necessarily excludes
the operation of the general law of limitation. The provisions of
the Limitation Act cannot be harmoniously construed with the
provisions prescribing special limitation under the NGT Act as in
that event it would defeat the very purpose of the NGT Act. A
limitation provided under special law must prevail over the
general law of limitation; particularly in face of the overriding
effect given to the NGT Act by the framers of the law in terms of
Section 33 of the NGT Act. In terms of Section 33, the provisions
of the NGT Act shall have effect notwithstanding anything
10
inconsistent contained in any other law for the time being in force.
The cumulative effect of all these factors would be that the special
limitation prescribed under the NGT Act does not admit any
exception to attract the applicability of the provisions of the
Limitation Act. Section 16 of the NGT Act controls the very
institution of an appeal in the Registry of the Tribunal. In terms
of Section 16, the appeal can be filed ‘within a further period not
exceeding 60 days’ but thereafter the Tribunal is not vested with
the power to allow the appeal to be filed beyond the total period of
90 days. Thus, the tribunal loses its jurisdiction to entertain an
appeal after the expiry of the special period of limitation provided
under proviso to Section 16 of the NGT Act.
10. A bench of five members of the National Green Tribunal, in
the case of Nikunj Developers v. State of Maharashtra, 2013 All
India NGT Reporter (Delhi) (1) 40, after discussing various
judgments of the Supreme Court had taken the view that the
Tribunal has no jurisdiction to condone the delay beyond a period
of 90 days, even if a sufficient cause is shown and the provisions
of the Limitation Act including Section 5 are excluded. The
tribunal held as under:
“19. From language of the above provision it is clear that the Tribunal loses jurisdiction to condone the delay if the delay is of more than 90 days. Every appeal has to be filed within 30 days from the date of communication of the order. That is, what an applicant is required to ensure before the appeal is heard on merits. However, the Tribunal has been vested with the jurisdiction to entertain the appeal which is filed after 30 days from the date of communication of an order. This power to
11
condone the delay has a clear inbuilt limitation as it ceases to exist if the appeal is filed in excess of 60 days, beyond the prescribed period of limitation of 30 days from the date of communication of such order. To put it simply, once the period of 90 days lapses from the date of communication of the order, the Tribunal has no jurisdiction to condone the delay. The language of the provision is clear and explicit. It admits of no ambiguity and the legislative intent that Tribunal should not and cannot condone the delay in excess of 90 days in all, is clear from the plain language of the provision.
20. As stated in the cases Hiralal Ratan Lal and India Houses (supra) the period of limitation statutorily prescribed, has to be strictly adhered to and cannot be relaxed and or departed from, on equitable consideration. Further, in construing a statutory provision, the first and the foremost rule of construction is that of literary construction. We do not see any reason to expand the scope of the provision and interpret the proviso to Section 16 in the manner that Tribunal can be vested with the power of condoning the delay beyond 90 days. Such interpretation would be contrary to the specific language of the Section and would defeat the very legislative intent and object behind this provision.
21. This controversy need not detain us any further as it is no more res integra and stands answered by the judgment of the Supreme Court in the case of Chhattisgarh State Electricity Board Vs. Central Electricity Regulatory Commission and others (2010) 5 SCC 23 where the court held as under:
“29. Section 34(3) of the Arbitration and Conciliation Act, 1996, which is substantially similar to Section 125 of the Electricity Act came to be interpreted in Union of India v. Popular Construction Company : (2001) 8 SCC 470. The precise question considered in that case was whether the provisions of Section 5 of the Limitation Act are applicable to an application challenging an award under Section 34 of the Arbitration and Conciliation Act, 1996. The two- Judge Bench referred to earlier decisions in Mangu Ram v. Municipal Corporation of Delhi: (1976) 1 SCC 392, Vidyacharan Shukla v. Khubchand Baghel AIR 1964 SC 1099, Hukumdev Narain Yadav v. L.N. Mishra (supra), Patel Naranbhai Marghabhai v. Dhulabhai Galbabhai : (1992) 4 SCC 264 and held:
12. As far as the language of Section 34 of the 1996 Act is concerned, the crucial words are “but
12
not thereafter” used in the proviso to Sub-section (3). In our opinion, this phrase would amount to an express exclusion within the meaning of Section 29(2) of the Limitation Act, and would therefore bar the application of Section 5 of that Act. Parliament did not need to go further. To hold that the court could entertain an application to set aside the award beyond the extended period under the proviso, would render the phrase “but not thereafter” wholly otiose. No principle of interpretation would justify such a result.
16. Furthermore, Section 34(1) itself provides that recourse to a court against an arbitral award may be made only by an application for setting aside such award “in accordance with” Sub-section (2) and Sub-section (3). Sub-section (2) relates to grounds for setting aside an award and is not relevant for our purposes. But an application filed beyond the period mentioned in Section 34, Sub- section (3) would not be an application “in accordance with” that Sub-section. Consequently by virtue of Section 34(1), recourse to the court against an arbitral award cannot be made beyond the period prescribed. The importance of the period fixed under Section 34 is emphasised by the provisions of Section 36 which provide that
“where the time for making an application to set aside the arbitral award under Section 34 has expired … the award shall be enforced under the Code of Civil Procedure, 1908 in the same manner as if it were a decree of the court”.
This is a significant departure from the provisions of the Arbitration Act, 1940. Under the 1940 Act, after the time to set aside the award expired, the court was required to “proceed to pronounce judgment according to the award, and upon the judgment so pronounced a decree shall follow” (Section 17). Now the consequence of the time expiring under Section 34 of the 1996 Act is that the award becomes immediately enforceable
without any further act of the court. If there were any residual doubt on the interpretation of the language used in Section 34, the scheme of the 1996 Act would resolve the issue in favour of curtailment of the court’s powers by the exclusion of the operation of Section 5 of the Limitation Act.
(emphasis supplied)
13
30. In Singh Enterprises v. C.C.E., Jamshedpur and Ors. (supra), the Court interpreted Section 35 of Central Excise Act, 1944, which is pari materia to Section 125 of the Electricity Act and observed:
8. The Commissioner of Central Excise (Appeals) as also the Tribunal being creatures of statute are vested with jurisdiction to condone the delay beyond the permissible period provided under the statute. The period up to which the prayer for condonation can be accepted is statutorily provided. It was submitted that the logic of Section 5 of the Limitation Act, 1963 (in short “the Limitation Act”) can be availed for condonation of delay. The first proviso to Section 35 makes the position clear that the appeal has to be preferred within three months from the date of communication to him of the decision or order. However, if the Commissioner is satisfied that the appellant was prevented by sufficient cause from presenting the appeal within the aforesaid period of 60 days, he can allow it to be presented within a further period of 30 days. In other words, this clearly shows that the appeal has to be filed within 60 days but in terms of the proviso further 30 days’ time can be granted by the appellate authority to entertain the appeal. The proviso to Sub-section (1) of Section 35 makes the position crystal clear that the appellate authority has no power to allow the appeal to be presented beyond the period of 30 days. The language used makes the position clear that the legislature intended the appellate authority to entertain the appeal by condoning delay only up to 30 days after the expiry of 60 days which is the normal period for preferring appeal. Therefore, there is complete exclusion of Section 5 of the Limitation Act. The Commissioner and the High Court were therefore justified in holding that there was no power to condone the delay after the expiry of 30 days’ period.
(emphasis supplied)”
22. The same view was reiterated in Commissioner of Customs, Central Excise v. Punjab Fibres Ltd. : (2008) 3 SCC 73.
“31. In Commissioner of Customs and Central Excise v. Hongo India Private Limited and Anr. (2009) 5 SCC 791, a three-Judge Bench considered the scheme of the Central Excise Act, 1944 and held that High
14
Court has no power to condone delay beyond the period specified in Section 35H thereof. The argument that Section 5 of the Limitation Act can be invoked for condonation of delay was rejected by the Court and observed:
“30. In the earlier part of our order, we have adverted to Chapter VI-A of the Act which
provides for appeals and revisions to various authorities. Though Parliament has specifically provided an additional period of 30 days in the case of appeal to the Commissioner, it is silent about the number of days if there is sufficient cause in the case of an appeal to the Appellate Tribunal. Also an additional period of 90 days in the case of revision by the Central
Government has been provided. However, in the case of an appeal to the High Court under
Section 35G and reference application to the High Court under Section 35H, Parliament has provided only 180 days and no further period for filing an appeal and making reference to the High Court is mentioned in the Act.
32. As pointed out earlier, the language used in Sections 35, 35B, 35EE, 35G and 35H makes the position clear that an appeal and reference to the High Court should be made within 180 days only from the date of communication of the decision or order. In other words, the language used in other provisions makes the position clear that the legislature intended the appellate authority to entertain the appeal by condoning the delay only up to 30 days after expiry of 60 days which is the preliminary limitation period for preferring an appeal. In the absence of any clause condoning the delay by showing sufficient cause after the prescribed period, there is complete exclusion of Section 5 of the Limitation Act. The High Court was, therefore, justified in holding that there was no power to condone the delay after expiry of the prescribed period of 180 days.
XXXXX XXXXX XXXXX XXXXX XXXXX
35. It was contended before us that the words “expressly excluded” would mean that there must be an express reference made in the special or local law to the specific provisions of the Limitation Act of which the operation is to be excluded. In this regard, we have to see the scheme of the special law
15
which here in this case is the Central Excise Act. The nature of the remedy provided therein is such that the legislature intended it to be a complete code by itself which alone should govern the several matters provided by it. If, on an examination of the relevant provisions, it is clear that the provisions of the Limitation Act are necessarily excluded, then the benefits conferred therein cannot be called in aid to supplement the provisions of the Act. In our considered view, that even in a case where the special law does not exclude the provisions of Sections 4 to 24 of the Limitation Act by an express reference, it would nonetheless be open to the court to examine whether and to what extent, the nature of those provisions or the nature of the subject- matter and scheme of the special law exclude their operation. In other words, the applicability of the provisions of the Limitation Act, therefore, is to be judged not from the terms of the Limitation Act but by the provisions of the Central Excise Act relating to filing of reference application to the High Court.
(emphasis supplied)
32. In view of the above discussion, we hold that Section 5 of the Limitation Act cannot be invoked by this Court for entertaining an appeal filed against the decision or order of the Tribunal beyond the period of 120 days specified in Section 125 of the Electricity Act and its proviso. Any interpretation of Section 125 of the Electricity Act which may attract applicability of Section 5 of the Limitation Act read with Section 29(2) thereof will defeat the object of the legislation, namely, to provide special limitation for filing an appeal against the decision or order of the Tribunal and proviso to Section 125 will become nugatory.”
23. Section 34 of the Arbitration and Conciliation Act, 1996 uses the expression ‘not thereafter’ while the provision under our consideration uses the terms ‘not exceeding’. Both these expressions use negative language. The intention is to divest the Courts/Tribunals from power to condone the delay beyond the prescribed period of limitation. Once such negative language is used, the application of provisions of Section 5 of the Limitation Act or such analogous provisions would not be applicable.
16
24. The use of negative words has an inbuilt element of ‘mandatory’. The intent of legislation would be to necessarily implement those provisions as stated.
25. Introduction or alteration of words which would convert the mandatory into directory may not be permissible. Affirmative words stand at a weaker footing than negative words for reading the provisions as ‘mandatory’. It is possible that in some provision, the use of affirmative words may also be so limiting as to imply a negative. Once negative expression is evident upon specific or necessary implication, such provisions must be construed as mandatory. The legislative command must take precedence over equitable principle. The language of Section 16 of the NGT Act does not admit of any ambiguity, rather it is explicitly clear that the framers of law did not desire to vest the Tribunal with powers, specific or discretionary, of condoning the delay in excess of total period of 90 days. At this stage, we may also refer to Principle of Statutory Interpretation by Justice G.P. Singh, 13th Edition, where it is stated as under:
“(c) Use of negative words
Another mode of showing a clear intention that the provision enacted is mandatory, is by clothing the command in a negative form. As stated by
CRAWFORD: “Prohibitive or negative words can rarely, if ever, be directory. And this is so even though the statute provides no penalty for disobedience.” As observed by SUBBARAO, J.: “Negative words are clearly prohibitory and are ordinarily used as a legislative device to make a statute imperative”. Section 80 and Section 87-B of the Code of Civil Procedure, 1908; section 77 of the Railways Act, 1890; Section 15 of the Bombay Rent Act, 1947; section 213 of the Succession Act, 1925; section 5-A of the Prevention of Corruption Act, 1947; section 7 of the Stamp Act, 1899; section 108 of the Companies Act, 1965; section 20(1) of the Prevention of Food Adulteration Act, 1954; section 55 of the Wild Life Protection Act, 1972 (as amended in 1956); section 10A of Medical Council Act, 1965 (as amended in 1993) and similar other provisions have therefore, been construed as mandatory. A provision requiring ‘not less than three months’ notice’ is also for the same reason mandatory.
But the principle is not without exception. Section 256 of the Government of India, 1953, was construed by the Federal Court as directory though worded in
17
the negative form. Directions related to solemnization of marriages though using negative words have been construed as directory in cases where the
enactments in question did not provide for the consequence that the marriage in breach of those directions shall be invalid. Considerations of general inconvenience, which would have resulted in holding these enactments mandatory, appear to have outweighed the effect of the negative words in reaching the conclusion that they were in their true meaning merely director. An interesting example, where negative words have been held to be directory, is furnished in the construction of section 25-F of the Industrial Dispute Act, 1947, where compliance of clause (c) has been held to be directory; although compliance of clauses (a) and (b) which are connected by the same negative words is understood as mandatory. These cases illustrate that the rule, that negative words are usually mandatory, is like any other rule subordinate to the context, and the object intended to be achieved by the particular
requirement.”
26. The provision of Section 16 of the NGT Act are somewhat similar to Section 34 of Arbitration and Conciliation Act, 1996. Thus, adopting an analogous reasoning, as was adopted in Chhattisgarh State Electricity Board (supra), we would have no hesitation in coming to the conclusion that we have no jurisdiction to condone the delay when the same is in excess of 90 days from the date of communication of the order to any person aggrieved.
27. Thus, the application must fail on this ground alone. We are of the considered view that the Tribunal has no jurisdiction to condone the delay of 19 days in filing the present appeal, the same being in excess of 90 days computed from the admitted date of communication of order, that is 2nd June, 2012.”
11. The above view of the tribunal was followed by different
Benches of this tribunal in the case of M/s. Krishna Stone
Crushers v. Haryana State Pollution Control Board, 2014 (1) All
India NGT Reporter (1) (Delhi) 42. In the case of Aradhana
Bhargav v. Ministry of Environment and Forests, 2013 All India
18
NGT Reporter (2) (Bhopal) 1, besides following the law stated in
Nikunj Developers (supra), the bench also clearly held that a
special enactment, which specifically provides period of limitation
would exclude the general law of limitation. Similar view was also
expressed by another Bench of the Tribunal in the case of Ms.
Medha Patkar v. MoEF & Ors., 2013 All India NGT reporter (Delhi)
285.
12. In all the above cases, the consistent view of the tribunal has
been that the tribunal has no jurisdiction to condone the delay
beyond the period of 90 days and it is in fact the very filing of the
appeal that is impermissible in terms of proviso to Section 16 of
the NGT Act. Admittedly, in the present case, the delay in filing
the appeal is beyond 90 days i.e. the total delay being 125 days.
Thus, this tribunal has no jurisdiction to entertain the appeal
after the expiry of the special limitation period provided under the
relevant provisions. We are unable to find any substance in the
submissions of the learned counsel appearing for the appellant,
that the judgments of the tribunal do not state the correct law
and/or are not applicable to the facts of the present case. We
have no hesitation in rejecting the said contention raised on
behalf of the appellant.
13. Having said so, we would still proceed to discuss the other
contentions raised on behalf of the appellant before the tribunal.
It is argued that the language of Section 16 of the NGT Act does
not expressly or by necessary implication exclude the provisions
19
of Sections 4 to 24 (inclusive) of the Limitation Act and thus,
squarely fall within the ambit of Section 29(2) of the Limitation
Act. A limitation period is the period of time prescribed by law
within which a person has to approach the prescribed
forum/court. The period of limitation is imposed by statutes.
There are different limitation periods for different types of cause of
action. The period of limitation controls the right of a party to
approach the court or tribunal. It also places an obligation upon
the court to examine if the claim arising before it, is barred by law
of limitation. For instance, the court can reject a plaint inter alia
on the ground that it is barred by any law in terms of Order VII
Rule 11 of the Code of Civil Procedure, 1908.
14. The policies underlying the law of limitation are ultimately
based on justice and convenience and an individual should not
live under the threat of a possible action for an indeterminate
period since it would be unjust. Prescription of limitation takes in
its ambit fairness and expeditious trial. Indefinite uncertainty in
relation to bringing an action would be opposed to public policy.
This concept is applicable with great emphasis to the
environmental jurisprudence where the project proponent may
invest large amount for making its project operational. Challenge
to such project on the ground that it does not have any
Environmental Clearance or otherwise, has to be within a
specified time, as otherwise it would not only be unfair but also be
seriously prejudicial to the interest of a party. Vigilance in the
20
pursuit of rightful claims should be encouraged so that these are
ethical or rational justifications for the law of limitation.
15. We have already noticed that NGT Act is a self-contained
code in itself. It provides the forum/procedure that has to be
adopted, the limitation period within which the jurisdiction of the
tribunal gets invoked, and the power and functions of the tribunal
in explicit terms. As a self-contained code, it does not admit of
any ambiguity with regard to application of other laws in the
adjudicatory process of the tribunal. The legislature in its wisdom
has worded provisions of Section 16 of the NGT Act so as to
prohibit even filing of an appeal beyond a total period of 90 days.
The language of these provisions clearly demonstrates the
legislative intendment on excluding application of general law of
limitation to this special statute. Such a view would also find
clear support from the language of Section 29 (2) of the Limitation
Act which postulates that when a special law prescribes for any
period of limitation different from the period prescribed in the
Schedule to the Limitation Act and the language of the provisions
of such special law is indicative of express or implied exclusion,
then Sections 4 to 24 (inclusive) of the Limitation Act shall apply
only and to the extent they are not excluded by the Special Law.
The cumulative reading of Section 16, particularly, the proviso
and Section 29 of the Limitation Act leaves no doubt in mind that
legislature had clearly intended to exclude the application of the
general law of limitation provided under the Limitation Act from
21
the NGT Act. Proviso to Section 16 of the NGT Act uses the
expression ‘allow it to be filed under this Section within a further
period not exceeding 60 days’. The use of the negative language
‘not’ in the proviso makes it mandatory that appeals cannot be
filed after the expiry of total period of 90 days and thus, there is
lack of jurisdiction of the tribunal to condone the delay beyond a
total period of 90 days. The framers of law, where, in their wisdom
wanted to give a benefit and/or restrict or place embargo on
exercise of a right, have done so by using specific language in
Section 16 of the NGT Act. A special concession is made available
to an appellant to file an appeal beyond 30 days, the initial period
of limitation prescribed under that provision. The framers there
put a specific embargo on the power of the Tribunal not to
entertain an appeal after the expiry of a further period of 60 days.
Thus the legislature, by necessary implication excluded the
application of general law of limitation from the provisions of the
NGT Act. At this stage we may refer to the judgment of the
Supreme Court in the case of Hukumdev Narain Yadav v. Lalit
Narain Mishra, (1974) 2 SCC 133, where the Supreme Court was
dealing with the provisions of the Representation of the Peoples’
Act, 1951 and the applicability of the provisions of the Limitation
Act. The Court in relation to the interpretation of the language of
Section 29(2) of the Limitation Act held as:
“17. What we have to determine is whether the provisions of this section are expressly excluded in the case of an election petition. It is contended before us that the words
22
“expressly excluded” would mean that there must be an express reference made in the special or local law to the specific provisions of the Limitation Act of which the operation is to be excluded. As usual the meaning given in the Dictionary has been relied upon, but what we have to see is whether the scheme of the special law, that is in this case the Act, and the nature of the remedy provided therein are such that the Legislature intended it to be a complete code by itself which alone should govern the several matters provided by it. If on an examination of the relevant provisions it is clear that the provisions of the Limitation Act are necessarily excluded, then the benefits conferred therein cannot be called in aid to supplement the provisions of the Act. In our view, even in a case where the special law does not exclude the provisions of Section 4 to 24 of the Limitation Act by an express reference, it would nonetheless be open to the Court to examine whether and to what extent the nature of those provisions or the nature of the subject-matter and scheme of the special law exclude their operation.”
16. From the above dictum of the Supreme Court of India, it is
clear that the exclusion can be by explicit language or even by
necessary implication. It will depend upon the scheme of the Act,
it being a self-contained code and what is the intent of legislature?
Furthermore, in the case of Union of India v. Popular Construction
& Co., AIR 2001 SC 4010, the Supreme Court held that the word
‘excluded’ appearing in Section 29(2) of the Act would also include
‘exclusion by necessary implication’. In the case of Gopal Sardar
v. Karuna Sardar, (2004) 4 SCC 252, the Supreme Court read
exclusion by implication, where some of the provisions in West
Bengal Land Reforms Act, 1955, provided for giving benefit of
Section 5 of the Limitation Act but Section 8 of the said Act did
not make such a provision. The court took the view that
23
legislature consciously excluded the application of Section 5 of the
Limitation Act.
17. Now let us examine the principles or relevant considerations
that would help in determining the issue whether the legislature
while framing a particular statute intended express, implied or no
exclusion of the general law of limitation. It is difficult to state
such principles exhaustively but inter alia the following would be
the relevant considerations:
a) Whether the statute in question is a self-contained code and
provides for a special forum or Tribunal?
b) Whether the statute provides for special limitation and
expressly or impliedly excludes the applicability of general
law of limitation?
c) Whether the scheme and object of the statute and the
relevant provisions of the statute require the limitation
prescribed thereunder the special law to prevail over the
general law of limitation?
d) Whether the cumulative reading of the provisions of the
special statute in back drop of the underlying object of the
statute makes the provisions mandatory and/or directory?
If we apply the above principles to the provisions of the NGT
Act, then, it is clear that NGT Act is a self-contained code, the
tribunal is a special tribunal with defined powers and functions,
24
with a prescribed procedure and unambiguous provisions of
limitation, clearly stating exclusion of general law of limitation.
18. Now, we may refer to some of the provisions under different
statutes where the language used is para materia or substantially
similar to the provisions of Section 16 of the NGT Act and the
interpretation given by the higher judiciary to such provisions.
Section 125 of the Electricity Act, 2003 (hereafter ‘the Electricity
Act’) reads as under:
“Any person aggrieved by any decision or order of the Appellate Tribunal, may, file an appeal to the Supreme Court within sixty days from the date of communication of the decision or order of the Appellate Tribunal, to him, on any one or more of the grounds specified in section 100 of the Code of Civil Procedure, 1908;
Provided that the Supreme Court may, if it is satisfied that the appellant was prevented by sufficient cause from filing the appeal within the said period, allow it to be filed within a further period not exceeding sixty days.”
19. The bare reading of the above provision shows that power to
condone the delay is vested with the Tribunal under that Act but
the said appeal cannot be permitted to be filed before the
appellate tribunal beyond the period of 60 days. The expression
used in the proviso to the section is ‘allow it to be filed within a
further period not exceeding 60 days.’ This provision came up for
consideration before the Supreme Court in the case of
Chhattisgarh State Electricity Board v. Central Electricity
Regulatory Commission,
(2010) 5 SCC 23, where the Supreme
Court held that the appellate tribunal had no jurisdiction to
25
entertain the appeal beyond the prescribed period of 120 days
specified in Section 125 of the Electricity Act and Section 5 of the
Limitation Act was not applicable. It was held that the proviso to
Section 125 of the Electricity Act and the interpretation attracting
the application of Section 5 of the Limitation Act read with Section
29(2) thereof, will defeat the object of the legislation, namely, to
provide special limitation for filing an appeal against the decision
or order of the Tribunal and proviso to Section 125 will become
nugatory.
20. In the case of Singh Enterprises v. Commissioner of Central
Excise, (2008) 3 SCC 70, the Supreme Court was concerned with
Section 35 of the Central Excise Act, 1944. The proviso to Section
35(1) empowers the Commissioner to allow appeal to be presented
within a further period of 30 days. The Supreme Court held that
“proviso to sub-Section (1) of Section 35 makes the provision
crystal clear that appellate authority has no power to allow the
appeal to be presented beyond the period of 30 days. The
language used makes the position clear that the legislature
intended the appellate authority to entertain the appeal by
condoning delay only up to 30 days after the expiry of 60 days
which is the normal period for preferring appeal. Therefore, there
is complete exclusion of Section 5 of the Limitation Act. The
Commissioner and the High Court were, therefore, justified in
holding that there was no power to condone the delay after the
expiry of 30 days period.”
26
21. The Supreme Court with reference to the language of the
above provisions declared that there was legislative intent to
exclude the application of provision of the Limitation Act by
necessary implication. However, even in the cases where specific
exclusion was not evident from the language of the provision but
there was clear absence of the “delay-condoning sections” of the
Limitation Act in the special statute, there also the Court had
taken the view that non-mentioning of such specific provisions
would amount to exclusion thereof.
22. In the case of Commissioner of Customs, Central Excise,
Noida v. Punjab Fibers Ltd., Noida, (2008) 3 SCC 73, the Supreme
Court while dealing with the provisions of Section 35(H)(1) of the
Central Excise Act, 1944, where the section only provides a
specific limitation for filing of an appeal, held that the appellate
authority has no power to allow the appeal to be presented after
the prescribed period of 180 days of the date upon which he was
served with the notice. The court while reiterating the principles
stated in Singh Enterprises (supra) further held that logic of
Section 5 of the Limitation Act cannot be availed for condonation
of delay as there was exclusion of Limitation Act. In the case of
Smt. Hetal Alpesh Muchhala v. Adityesh Educational Institute and
Ors., (2009) 152 CompCas 75 (Bom), the High Court of Bombay
while dealing with the proviso to Section 10(F) of the Companies
Act, 1956, which uses the expression, ‘not exceeding 60 days’, the
contention that the benefit of Section 5 of the Limitation Act, 1963
27
can be granted and that an appeal could be entertained even after
the prescribed period of 60 days that there was clear exclusion of
Section 5 of the Limitation Act and held as under:
“20. The words used in the proviso to Section 10F of the Companies Act, 1956, are “not exceeding 60 days” thereby clearly prescribing the time limit of only 60 days, in addition to the initial period of 60 days allowed under Section 10F of the Companies Act, 1956, to enable a party to file an appeal. The proviso clearly shows that the power vested in the court to condone delay on sufficient cause being shown is directory and subject to the discretion vested in the court. However, the maximum period to the extent of which such delay is capable of being condoned is mandatorily prescribed and not open to exercise of any discretion. The words “not exceeding” cannot be given any other meaning except “not more than” or “not beyond” or “not thereafter”. Therefore, in my view, the words “not exceeding 60 days” would amount to an express exclusion within the meaning of Section 29(2) of the Limitation Act, 1963 and would therefore bar the application of Section 5 of the Limitation Act to Section 10F of the Companies Act, 1956. To hold that the court could entertain an application to set aside the decision/order passed by the Company Law Board beyond the extended period under the proviso, to Section 10F of the Companies Act, 1956, would render the phrase “not exceeding 60 days” wholly otiose.”
23. In the other case of Mer Ramda Vejunandbhai and etc. v.
Hardashbhai Parbatbhai and Ors, AIR 1992 Gujarat 122, the
Court while dealing with the provisions of Motor Vehicles Act
1988, which provides due limit of 12 months for filing claim under
the Act, held that provisions of Section 5 of the Limitation Act,
would not be applicable as the legislature has expressly excluded
the same by special law i.e. proviso to Section 163 of the Motor
Vehicle Act, 1988.
28
24. From the above dictum declared by the Supreme Court of
India, it is clear that wherever the words like ‘not exceeding’, ‘not
more than’, ‘not beyond’ or ‘not thereafter’ are used in the
provisions of limitation under different statutes, a view has been
taken that the general provisions of the Limitation Act would
stand excluded. Even if, there was no specific provision expressly
providing exclusion, the Courts have read exclusion into such
provisions on the principle of implied exclusion. In the case before
us, the Learned Counsel for the appellant, while contending that
there was no express or implied exclusion in the language of the
provisions of the NGT Act and that the benefit of the provisions of
the Limitation Act would be available to the appellant placed
relevance upon the judgment of the Supreme Court in the case of
Mangu Ram v. Municipal Corporation Of Delhi, (1976) 1 SCC, 392,
wherein the Supreme Court was considering the provisions of
Section 417(4) of Criminal Procedure Code, 1898 (378 of CrPC,
1973) which provides that no special leave to appeal from the
order of acquittal shall be entertained by the High Court where
the complainant is a public servant and 60 days in every other
case, computed from the date of that order of acquittal. The
question which the Court was called upon to decide was, whether
the provisions of Section 5 of the Limitation Act would be
attracted to the benefit of appellant or not and whether Section
29(2)(b) of the Limitation Act, 1908 would cover such a case.
Answering the above question in the affirmative, the Supreme
29
Court held that the provision of Section 5 were applicable and
while distinguishing the case of Kaushalya Rani v. Gopal Singh,
AIR 1964 SC 260 the Court held as under:
“7. It is only if the special or local law expressly excludes the applicability of Section 5, that it would stand displaced. Here, as pointed out by this Court in Kaushalya Rani’s case, the time limit of sixty days laid down in Sub-section (4) of Section 417 is a special law of limitation and we do not find anything in this special law which expressly excludes the applicability of Section 5. It is true that the language of Sub-section (4) of Section 417 is mandatory and compulsive, in that it provides in no uncertain terms that no application for grant of special leave to appeal from an order of acquittal shall be entertained by the High Court after the expiry of sixty days from the date of that order of acquittal. But that would be the language of every provision prescribing a period of limitation. It is because a bar against entertainment of an application beyond the period of limitation is created by a special or local law that it becomes necessary to invoke the aid of Section 5 in order that the application may be entertained despite such bar. Mere provision of a period of limitation in howsoever peremptory or imperative language is not sufficient to displace the applicability of Section 5. The conclusion is, therefore, irresistible that in a case where an application for special leave to appeal from an order of acquittal is filed after the coming into force of the Limitation Act, 1963, Section 5 would be available to the applicant and if he can show that he had sufficient cause for not preferring the application within the time limit of sixty days prescribed in Sub-section (4) of Section 417, the application would not be barred and despite the expiration of the time limit of sixty days, the High Court would have the power to entertain it.”
We may also notice here that Kaushalya Rani (supra) was a
Three Judge Bench judgment of the Supreme Court while Mangu
Ram (supra) was a Two Judge Bench judgment. In Mangu Ram,
the Bench had distinguished Kaushalya Rani also on the ground
that it dealt with Section 5 and 29 (2) (b) of the Limitation Act of
30
1908, while Mangu Ram was dealing with Section 5 and 29 (2) of
the Limitation Act of 1963 and there was not only linguistical
distinction between these provisions but they varied in substance
as well. Section 29 (2)(b) had dealt with specific application of
Section 5 of the Limitation Act of 1908, while Section 29 (2) of the
Limitation Act of 1963 dealt with Section 4 to 24, both inclusive,
of the Limitation Act of 1963.
25. The other judgment brought to the notice of the Tribunal is
Mukri Gopalan v. Cheppilat Puthanpurayil Aboobacker, (1995) 5
SCC 5, where another Two Judge Bench of the Supreme Court
dealing with the provisions of Section 18 of the Kerala Buildings
(Lease and Rent Control) Act, 1965 (for short ‘the Kerala Rent
Control Act’) and Section 29 (2) and 5 of the Limitation Act of
1963 took the view that the advantage of Section 5 of Limitation
Act would be applicable to such proceedings. Section 18 of the
Kerala Rent Control Act, provided for an appeal to the Appellate
Authority within 30 days from the date of the impugned order. It
further provided that the period taken to obtain certified copy of
the order shall be excluded. The Court held that the two
requirements stated in Section 29 (2) of the Limitation Act were
satisfied and thus it would follow that the provisions of Section 5
would be applicable and come to the aid of appellant in that case
if he has shown sufficient cause.
26. The above referred two judgments in the case of Mangu Ram
(supra) and Mukri Gopalan (supra) do not state or enunciate the
31
correct exposition of law for variety of reasons. Amongst others,
firstly, these judgments do not consider earlier judgments of the
Supreme Court even by larger Benches. This would attract the
principle of stare decisis. Secondly, the language of the provisions
that fall for consideration of the Supreme Court in these two
cases is completely distinct and different from the language of the
provision which came up for discussion before the Supreme Court
in other cases. They are in any case not in parity with the
language of Section 16 of the NGT Act. On a plain reading of the
provisions with which the Court was concerned in the above two
cases, the language of the relevant provisions did not either
expressly or impliedly provide for an exclusion of the Limitation
Act. Lastly, these cases came to be considered by the Supreme
Court itself, even by the larger Benches subsequently and more
particularly in the case of Gopal Sardar (supra) where in
paragraph 14 and 15 of the judgment, the Supreme Court
deliberated upon these judgments and did not concur with the
view. Same was also considered in the case of Chhattisgarh State
Electricity Board (supra) where in paragraph 33 of the case of
Mukri Gopalan (supra) was noticed by the Supreme Court,
however, the view expressed in that judgment was not followed.
The proposition of law has been clearly stated by the Supreme
Court in the case of Kaushalya Rani (supra), Hukum Dev Narayan
Yadav (supra), Vidyacharan Shukla v. Khubchand Baghel, AIR
1964 SC 1099 (Constitution Bench) and Chhattisgarh State
32
Electricity Board (supra) and The Commissioner of Sales Tax, U.P.,
Lucknow v. Parson Tools and Plants, (1975) 4 SCC 22.
27. In Parson Tools and Plants (supra), the Court observed that
where the legislature clearly declares its intent in the scheme and
language of the statute, it is the duty of the Court to give full
effect to the same, without scanning its wisdom and policy and
without engrafting, adding or implying anything which is not
congenial to or consistent with such expressed intent of the law-
giver. In the case of Vidya Charan Shukla (supra), the Bench of
the Supreme Court accepted the application of the principle of
implied exclusion. The concept of ‘complete code’ was applied by
the Supreme Court in Hukum Dev Narayan Yadav (supra) case,
where the Court discarded the dictionary meaning of the word
‘expressly excluded’ and accepted the doctrine of implied
exclusion.
28. In the case of Union of India v. M/s Popular Construction
Company (supra), the Supreme Court was concerned with the
provisions of Section 34 of the Arbitration and Conciliation Act,
1996 (for short ‘Arbitration and Conciliation Act’). The Learned
Single Judge of the High Court rejected the application on the
ground that it was barred by time, which view was upheld by the
Division Bench of the High Court. Proviso to Section 34(3) of the
Arbitration Act provided that if the Court was satisfied that
appellant was prevented by sufficient cause from making the
application “within the prescribed period of three months, it may
33
entertain the application within a further period of 30 days, but
not thereafter”. The Court held as under:
“12. As far as the language of Section 34 of the 1996 Act is concerned, the crucial words are ‘but not thereafter’ used in the proviso to sub-section (3). In our opinion, this phrase would amount to an express exclusion within the meaning of Section 29(2) of the Limitation Act, and would therefore bar the application of section 5 of that Act. Parliament did not need to go further. To hold that the Court could entertain an application to set aside the Award beyond the extended period under the proviso, would render the phrase ‘but not thereafter’ wholly otiose. No principle of interpretation would justify such a result.”
29. We may also refer to the case of Commissioner of Customs &
Central Excise v. Hongo India (P) Ltd., 2009 (5) SCC 791, where the
Court while considering the provisions of Section 35(H) of the
Central Excise Act, 1944 and applicability of Section 5 of the
Limitation Act to the applications filed beyond the prescribed
period of limitation, repelled the contention that Section 5 would
be attracted and held as under:
“31. In this regard, it is useful to refer to a recent decision of this Court in Punjab Fibres Ltd. The Commissioner of Customs, Central Excise, Noida was the appellant in this case. While considering the very same question, namely, whether the High Court has power to condone the delay in presentation of the reference under Section 35H(1) of the Act, the two-Judge Bench taking note of the said provision and the other related provisions following Singh Enterprises v. CCE6 concluded that: (Punjab Fibres Ltd. case1, SCC p. 75, para 8)
“the High Court was justified in holding that there was no power for condonation of delay in filing reference application.”
32. As pointed out earlier, the language used in Sections 35, 35B, 35EE, 35G and 35H makes the position clear
34
that an appeal and reference to the High Court should be made within 180 days only from the date of communication of the decision or order. In other words, the language used in other provisions makes the position clear that the legislature intended the appellate authority to entertain the appeal by condoning the delay only up to 30 days after expiry of 60 days which is the preliminary limitation period for preferring an 18 appeal. In the absence of any clause condoning the delay by showing sufficient cause after the prescribed period, there is complete exclusion of Section 5 of the Limitation Act. The High Court was, therefore, justified in holding that there was no power to condone the delay after expiry of the prescribed period of 180 days.
35. It was contended before us that the words “expressly excluded” would mean that there must be an express reference made in the special or local law to the specific provisions of the Limitation Act of which the operation is to be excluded. In this regard, we have to see the scheme of the special law here in this case is Central Excise Act. The nature of the remedy provided therein are such that the legislature intended it to be a complete Code by itself which alone should govern the several matters provided by it. If, on an examination of the relevant provisions, it is clear that the provisions of the Limitation Act are necessarily excluded, then the benefits conferred therein cannot be called in aid to supplement the provisions of the Act. In our considered view, that even in a case where the special law does not exclude the provisions of Sections 4 to 24 of the Limitation Act by an express reference, it would nonetheless be open to the court to examine whether and to what extent, the nature of those provisions or the nature of the subject-matter and scheme of the special law exclude their operation. In other words, the applicability of the provisions of the Limitation Act, therefore, to be judged not from the terms of the Limitation Act but by the provisions of the Central Excise Act relating to filing of reference application to the High Court.”
Having noticed various judgments of the Supreme Court and
the High Courts for and against the proposition, the undisputed
principle that emerges and which has been consistently followed
35
by the Supreme Court, is that a mere provision of the period of
limitation in the statute is not sufficient to displace the
applicability of the provisions of the Limitation Act. But where the
act is a complete code in itself and where the scheme of the Act
and the language of the relevant provisions expressly or impliedly
exclude the applicability of the general law of limitation, then
such exclusion is accepted by the Court. Not only the scheme of
the NGT Act, which is a self contained code, clearly demonstrates
legislative intent for exclusion of the general law of limitation, but
specifically gives precedence to the provisions of the NGT Act in
terms of Section 33 of the NGT Act, which clearly means that the
provisions of limitation contained in the NGT Act would prevail
and by necessary implication would exclude the application of the
provisions of the Limitation Act. Thus, it squarely satisfies the
ingredients of Section 29(2) of the Limitation Act.
30. It is next contended on behalf of the appellant that since no
penal consequences for default in not filing application within 90
days have been provided under the NGT Act, it should be
construed that the legislature did not intend to exclude the
application of the provisions of the Limitation Act from the NGT
Act. Even this contention of the appellant does not impress us.
We have already referred to the relevant provisions of the NGT Act
in relation to limitation. The consequences of not filing an appeal
within the prescribed period of limitation are inbuilt in proviso to
Section 16. It is the very filing of the appeal under Section 16 of
36
the NGT Act that stands barred if it is brought beyond the period
of 90 days. The language of the proviso clearly imposes a duty
upon the Tribunal not to permit filing of the appeal if the same is
filed beyond the further period of 60 days.
31. In terms of the proviso to Section 16 of the NGT Act, the twin
consequences that flow from the very language thereof are that
firstly, it takes away the right of a party to file an appeal on the
expiry of 90 days and simultaneously, it vests a valuable right in
the opposite party. Secondly, it takes away the very jurisdiction of
the Tribunal to entertain or allow filing of appeal after the expiry
of the prescribed period. None of the provisions vest jurisdiction in
the Tribunal to condone the delay after the expiry of 90 days, be
there a sufficient cause or not for filing the appeal after that
period. In the light of this, the contention that the section does
not provide for any civil consequences can hardly be accepted. To
examine the consequences of a default in a provision, the rule of
plain construction should normally be applied. If upon bare
reading of the provision consequences are clear and such
consequences are in line with the object and purpose of the Act,
then there is no occasion for the Court or the Tribunal to read
words into the provisions which are non-existent. Wherever the
language of a statute, in its ordinary meaning and grammatical
construction, leads to a manifest contradiction of an apparent
purpose of the enactment, there it may be advisable to modify the
37
meaning of the words. The Court or the Tribunal would adopt an
interpretation which is reasonable and sensible rather than that
which is none of those things [Sri Nasiruddin v. State Transport
Appellate Tribunal, AIR (1976) SC 331]. Often applied principle of
interpretation is that where the statutory provision is plain and
unambiguous, the Court shall not interpret the same in a
different manner only because of harsh consequences arising
therefrom [Refer E. Palanisamy v. Palanisamy (D) by Lrs. and Ors.,
(2003) 1 SCC 123]. Mere inconvenience or some hardship has not
been accepted as a relevant consideration for giving different
meaning to the provision which otherwise is clear and
unambiguous on its plain reading. Limitation is a statute of
repose. It ordinarily bars a remedy, but does not extinguish a
right. Ordinarily, the words of a statute have to be given their
strict grammatical meaning and equitable considerations are out
of place, particularly in provisions of law limiting the period of
limitation for filing suits or legal proceedings. In General Accident
and Life Assurance Corporation Ltd. v. Janmahomed Abdul Rahim,
AIR 1941 PC 6, the Supreme Court held as under:
“A limitation Act ought to receive such a construction as the language in its plain meaning imports…… Great hardship may occasionally be caused by statutes of limitation in cases of poverty, distress and ignorance of rights, yet the statutory rules must be enforced according to their ordinary meaning in these and other like cases.”
32. The provisions providing for period of limitation cannot be so
liberally construed so as to not only deprive the right to other
38
party to whom a benefit has accrued, but even frustrate the very
purpose of such provision. In the case of P.K. Ramachandran v.
State of Kerala & another, AIR 1998 SC 2276, the Supreme Court
held as under:
“6. Law of limitation may harshly affect a particular party but it has to be applied with all its rigour when the statute so prescribe and the Courts have no power to extend the period of limitation on equitable grounds. The discretion exercised by the High Court was, thus, neither proper nor judicious. The order condoning the delay cannot be sustained. This appeal, therefore, succeeds and the impugned order is set aside. Consequently, the application for condonation of delay filed in the High Court would stand rejected and the Miscellaneous First Appeal shall stand dismissed as barred by time. No costs.”
33. Normally, the statutory period of limitation provided in a
provision like under the NGT Act, is un-extendable by recourse to
provisions of Section 5 of the Limitation Act. While applying the
provisions of limitation, besides applying the rule of strict
construction, the Tribunal has to keep a balance between rival
rights of the parties; appellant who has lost his right or whose
remedy is barred by time and other to whom a benefit has
accrued as a result of loss of right of the first. At this stage, it
may be appropriate to make reference to a recent judgment of the
Supreme Court, in the case of Esha Bhattacharjee v. Managing
Committee of Raghunathpur Nafar Academy and others, Civil
Appeal Nos. 8183-8184 of 2013 (Arising out of SLP (C) Nos.
24868-24869 of 2011), where the Court was primarily concerned
with the condonation of delay in filing an appeal. The Court
39
adverted itself towards the respective rights and obligations of the
parties and held as under:
“26. The law of limitation is a substantive law and has definite consequences on the right and obligation of a party to arise. These principles should be adhered to and applied appropriately depending on the facts and circumstances of a given case. Once a valuable right has accrued in favour of one party as a result of the failure of the other party to explain the delay by showing sufficient cause and its own conduct, it will be unreasonable to take away that right on the mere asking of the applicant, particularly when the delay is directly a result of negligence, default or inaction of that party. Justice must be done to both parties equally. Then alone the ends of justice can be achieved. If a party has been thoroughly negligent in implementing its rights and remedies, it will be equally unfair to deprive the other party of a valuable right that has accrued to it in law as a result of his acting vigilantly.
vii) The concept of liberal approach has to encapsule the conception of reasonableness and it cannot be allowed a totally unfettered free play.”
In light of these principles, the contention of the appellant
that the National Green Tribunal is the forum to which first
appeal is provided against the orders specified in Section 16 of the
NGT Act and that these provisions should be construed liberally,
can hardly be accepted. Also there is no question of depravation of
right to appellant. The right of appeal is a statutory right and can
be exercised within the prescribed period of limitation. If a party
chooses to sleep over its right and permits the remedy available to
it to become barred by time, then it can hardly be heard to
contend that it has lost a valuable right and the result is unjust.
Such interpretation would be a normal corollary of application of
rule of ‘plain construction’. This would be in line with the object
40
and purpose of the Act and would also subserve the cause of
justice. This interpretation would not preclude any litigant from
taking recourse to an appropriate remedy prescribed in the Act
and in accordance with law.
34. The provisions of Section 16 of the NGT Act do not admit of
any ambiguity or absurdity. It clearly provides the period of
limitation and the consequences of default for not filing the appeal
within the prescribed period of limitation. We do not see any
reason to give any other interpretation to the provisions of Section
16 of the NGT Act than the one which the legislature in its
wisdom has expressed in plain and unambiguous terms.
35. Lastly, we shall deal with the contention of the appellant that
the provisions of Section 16 of the NGT Act prescribing limitation
are ‘directory’ and not ‘mandatory’, therefore, rule of ‘liberal
construction’ would justify recourse to the provisions of the
Limitation Act in condoning the delay even beyond the prescribed
period of limitation (90 days). In support of such contention,
reference is made to the provisions of Order VIII Rule 1 of the
Code of Civil Procedure, 1908, where language para materia to
Section 16 of the NGT Act has been used and has been held to be
‘directory’ in various cases. To examine the merit of this
contention, it is necessary for us to explain the distinction
between the ‘mandatory’ and ‘directory’ in law.
41
36. ‘Mandatory’ and ‘directory’ are two parallel expressions
which are incapable of being used synonymously or alternatively
for each other. What is ‘mandatory’ cannot be ‘directory’ and vice-
versa. With the development of law, the distinction between these
expressions has become finer but not clearly definite in terms.
Whereas ‘mandatory’ provisions should be fulfilled and obeyed
exactly, substantial compliance is all that is necessary with the
provisions of a ‘directory’ enactment. Even the question of
prejudice becomes relevant while examining the distinction
between these two expressions. Describing this distinction in his
book ‘Principle of Statutory Interpretation’, 13th Edition, 2012
(page 393 to Page 396), Justice G.P. Singh, referring to various
case laws on the subject noticed as follows:
“6. MANDATORY AND DIRECTORY PROVISIONS
(a) General
The study of numerous cases on this topic does not lead to formulation of any universal rule except this that language alone most often is not decisive, and regard must be had to the context, subject-matter and object of the statutory provision in question, in determining whether the same is mandatory or directory. In an oft-quoted passage LORD CAMPBELL said: “No universal rule can be laid down as to whether mandatory enactments shall be considered directory only or obligatory with an implied nullification for disobedience. It is the duty of Courts of justice to try to get at the real intention of the Legislature by carefully attending to the whole scope of the statute to be considered”. As approved by the Supreme Court; “The question as to whether a statute is mandatory or directory depends upon the
42
intent of the Legislature and not upon the language in which the intent is clothed. The meaning and intention of the Legislature must govern, and these are to be ascertained not only from the phraseology of the provision, but also by considering its nature, its design, and the consequences which would follow from construing it the one way or the other”. “For ascertaining the real intention of the Legislature”, points out SUBBARAO, J. “the court may consider inter alia, the nature and design of the statute, and the consequences which would follow from
construing it the one way or the other; the impact of other provisions whereby the necessity of complying with the provisions in question is avoided; the circumstances, namely, that the statute provides for a contingency of the non-compliance with the provisions; the fact that the non-compliance with the provisions is or is not visited by some penalty; the serious or the trivial consequences, that flow there from; and above all, whether the object of the legislation will be defeated or furthered”. If object of the enactment will be defeated by holding the same directory, it will be construed as mandatory, whereas if by holding it mandatory serious general inconvenience will be created to innocent persons without very much furthering the object of enactment, the same will be construed as directory. But all this does not mean that the language used is to be ignored but only that the prima facie inference of the intention of the Legislature arising from the words used may be displaced by considering the nature of the enactment, its design and the consequences flowing from alternative constructions. Thus, the use of the words ‘as nearly as may be’ in contrast to the words ‘at least’ will prima facie indicate a directory requirement, negative words a mandatory requirement ‘may’ a directory requirement and ‘shall’ a mandatory requirement.
If a provision is mandatory an act done in breach thereof will be invalid, but if it is directory the act will be valid although the non-compliance
43
may give rise to some other penalty if provided by the statute.”
37. One of the most often quoted distinction between a
mandatory and a directory provision is that failure to comply with
a ‘directory’ provision does not invalidate underlining proceedings
unless complaining party can show serious prejudice, while non-
compliance of ‘mandatory’ statute would not necessarily require
presence of prejudice. The Supreme Court in the case of Hari
Vishnu Kamath v. Syed Ahmad Ishaque and Ors., AIR (1955) SC
233, held “the practical bearing of the distinction between a
provision which is ‘mandatory’ and one which is ‘directory’ is that
the former must be strictly observed, while in the case of latter it
is sufficient that it is substantially complied with”.
38. The Supreme Court in the case of Fairgrowth Investments
Ltd. v. The Custodian, (2004) 11 SCC 472, was concerned with the
provisions of the Special Courts (Trial of Offences Relating to
Transactions in Securities) Act, 1992. Section 4(2) of the said Act
permitted any person aggrieved by a notification issued under
Sub-section (2) of Section 3 of the said Act, to file a petition
objecting to the notification within 30 days of the issuance of the
notification. Section 10(3) of the same Act provided that an appeal
to the Supreme Court would lie from any judgment, sentence or
order passed by the Special Court within a period of 30 days from
the date of such judgment or Order. Further, the proviso to
Section 10(3) empowered the Supreme Court to entertain the
44
appeal even after the expiry of 30 days, if the court was satisfied
that sufficient cause has been shown in filing the appeal
belatedly. Section 13 of the said Act provided that provisions of
the Act would have overriding effect over other laws. In light of
these provisions, the Supreme Court while rejecting the argument
that no penal consequences were provided and that Section 4(2)
did not exclude the application of the provisions of the Limitation
Act, held that under Section 4(2), the Special Court was not
vested with the power to condone the delay and, therefore,
provisions of Section 4 (2) of the Act could not be said to be
‘directory’. The Court held that Section 29 (2) of the Limitation Act
did not apply to the proceedings under the special law. The Court
while following the principle stated in Gopal Sardar (supra) held
as under:
“9. We are of the view that the provision prescribing a time limit for filing a petition for objection under Section 4(2) of the Act is mandatory in the sense that the period prescribed cannot be extended by the Court under any inherent jurisdiction of the Special Court. Prescribed periods for initiating or taking steps in legal proceedings are intended to be abided by, subject to any power expressly conferred on the court to condone any delay. Thus the Limitation Act 1963 provides for different periods of limitation within which suits, appeals and applications may be instituted or filed or made as the case may be. It also provides for exclusion of time from the prescribed periods in certain cases, lays down bases for computing the period of limitation prescribed and expressly provides for extension of time under Section 5 in respect of certain proceedings. If the periods prescribed were not mandatory, it was not necessary to provide for exclusion or extension of time in certain circumstances nor would the method of computation of time have any meaning.”
45
39. Still in the case of State Bank of India v. B.S. Agricultural
Industries, (2009) 5 SCC 121, the Supreme Court while dealing
with the Section 24A of the Consumer Protection Act, 1986, held
that the expression ‘shall not admit a complaint if it is filed after
two years from the date on which the cause of action has arisen’,
is sort of a legislative command to the forum to examine and
ensure that the complaint is filed within the prescribed time, thus
withholding the rule of plain construction.
40. At this stage, it will be appropriate to refer to the judgment
of the Supreme Court in the case of May George v. Special
Tahsildar and Ors., (2010) 13 SCC 98, where the Court stated the
precepts which would be normally examined by the Courts for
determining whether the provision is ‘mandatory’ or ‘directory’.
The Court held as under:
“(a) While determining whether a provision is mandatory or directory, somewhat on similar lines as afore-noticed, the Court has to examine the context in which the provision is used and the purpose it seeks to achieve;
(b) To find out the intent of the legislature, it may also be necessary to examine serious general inconveniences or injustices which may be caused to persons affected by the application of such provision;
(c) Whether the provisions are enabling the State to do some things and/or whether they prescribe the methodology or formalities for doing certain things;
(d) As a factor to determine legislative intent, the court may also consider, inter alia, the nature and design of the statute and the consequences which would flow from construing it, one way or the other;
46
(e) It is also permissible to examine the impact of other provisions in the same statute and the consequences of non-compliance of such provisions;
(f) Physiology of the provisions is not by itself a determinative factor. The use of the words ‘shall’ or ‘may’, respectively would ordinarily indicate imperative or directory character, but not always.
(g) The test to be applied is whether non-compliance with the provision would render the entire proceedings invalid or not.
(h) The Court has to give due weight age to whether the interpretation intended to be given by the Court would further the purpose of law or if this purpose could be defeated by terming it mandatory or otherwise.
41. The distinction between mandatory and directory provisions
is a well accepted norm of interpretation. The general rule of
interpretation would require the word to be given its own meaning
and the word ‘shall’ would be read as ‘must’ unless it was
essential to read it as ‘may’ to achieve the ends of legislative
intent and understand the language of the provisions. It is
difficult to lay down any universal rule, but wherever the word
‘shall’ is used in a substantive statute, it normally would indicate
mandatory intent of the legislature.
42. Crawford on ‘Statutory Construction’ has specifically stated
that language of the provision is not the sole criteria; but the
Courts should consider its nature, design and the consequences
which could flow from construing it one way or the other.”
43. In the case of Mulchand Khanumal Khatri v. State of Gujarat
and Ors., (2012) 5 SCC 365, the Court held that Section 11A of
47
the Land Acquisition Act, 1894 (amended in 1984), which
provides that if an award is not made within a period of
declaration, the acquisition proceedings would lapse, was
‘mandatory’.
44. In the case of Mohd. Ashfaq v. State Transport Appellate
Tribunal, Uttar Pradesh and Ors., (1976) 4 SCC 330, the Supreme
Court while dealing with the provisions of Section 58(2) of the
Motor Vehicles Act, 1939, where the application for renewal of
stage carriage permit was to be made in not less than 120 days
before the date of its expiry considered the question whether the
regional transport authority may entertain an application after
the last date specified as above ‘if the application is made not
more than 15 days after the said last date’. The Supreme Court
held as under:
“Section 29, Sub-section (2) of the Limitation Act, 1963 makes Section 5 applicable in the case of an application for renewal unless its applicability can be said to be expressly excluded by any provision of the Act. The only provision of the Act sought to be pressed into service for this purpose was Sub-section (3). Does Sub-section (3) expressly exclude further extension of time under Section 5 ? If it does, then Section 5 cannot be availed of by the appellant for condonation of the delay. Sub- section (3) in so many terms says that the Regional Transport Authority may condone the delay in making of an application for renewal and entertain it on merits provided the delay is of not more than 15 days. This clearly means that if the application for renewal is beyond time by more than 15 days, the Regional Transport Authority shall not be entitled to entertain it, or in other words, it shall have no power to condone the delay. There is thus an express provision in Sub-section (3) that delay in making an application for renewal shall be condonable only if it is of not more than 15 days and that expressly excludes the applicability of Section 5 in
48
cases where an application for renewal is delayed by more than 15 days.”
The Supreme Court took the view that the provisions of
Section 58(2) above expressly excluded the application of Section
5 of the Limitation Act within the provisions of Section 29(2)
thereof. Whenever the Court is called upon to examine whether a
provision of a statute or a rule having statutory force is
‘mandatory’ or merely ‘directory’, it can be decided only after
gathering the purpose and object behind such statute, the
scheme of the Act, fall out consequences that might flow from
insisting upon strict observance of a particular provision and its
correlation with the other provisions.
45. The purpose and object of the statute is important. The
weighing consequences of holding a provision to be ‘mandatory’ or
‘directory’ are of significant relevance. We have already indicated
that the consequences are inbuilt in the language of Section 16 of
the NGT Act and serious civil consequences flow from default in
adhering to the time prescribed therein. Not only that the party
loses the right to prefer an appeal against an order from which it
is aggrieved, but there is a duty cast upon the Tribunal not to
permit filing of the appeal beyond the prescribed period of
limitation.
46. The Learned Counsel appearing for the appellant relied upon
the judgment of Supreme Court in the case of Kailash v. Nanhku
and Ors, (2005) 4 SCC 480, to contend that the language used in
49
Section 16 of the NGT Act is para materia to the language used in
Order VIII Rule 1 of the Civil Procedure Code, 1908 and since the
Supreme Court in this case held Order VIII Rule 1 of the Civil
Procedure Code, 1908, as ‘directory’, therefore, the provisions of
Section 16 of the NGT Act should be held to be ‘directory’ by the
Tribunal. Thus, the appellant would be entitled to the benefit of
the provisions of the Limitation Act in regard to the condonation
of delay.
47. Reliance is also placed upon the judgment of the Supreme
Court in the case of Salem Advocate Bar Association, Tamil Nadu
v. Union of India, (2005) 6 SCC 344. The above contention can be
directed into two distinct sections. Firstly, whether the language
of Order VIII Rule 1 of Code of Civil Procedure, 1908 and Section
16 of the NGT Act are para materia and therefore, the provisions
of Section 16 should be held to be directory. Secondly, whether
the judgment of the Supreme Court on facts thereof and for the
reasons recorded therein, have any application to the present
case.
48. The language of Order VIII Rule 1 of the Code of Civil
Procedure, 1908, cannot by any stretch of imagination be equated
with, much less considered as identical to, the provisions of
Section 16 of the NGT Act. Order VIII Rule 1 relates to a
procedural law, while Section 16 is part of substantive law. A bare
reading of Order VIII Rule 1 clearly conveys the intent of the
50
framers to make the provisions ‘directory’ and it provides for no
consequences of default therein. Most importantly, it must be
noticed that even if a defendant does not file the written
statement under Order VIII Rule 1, the suit does not come to an
end and the defendant does not lose his right to contest the suit
on questions of law, cross examination of witnesses and even to
lead his own evidences. Order VIII Rule 1 has to be read with
other provisions of Code of Civil Procedure, 1908 which does not
render the default in filing the written statement within the time
prescribed, as of any fatal or serious civil consequences. More so,
the said provision does not even apply to the original side of the
Chartered High Courts, as held by the Supreme Court in Iridium
India Telecom Ltd. v. Motorola Inc., AIR 2005 SC 514.
49. In contradistinction thereto, the provision of Section 16 of
the NGT Act is specific, unambiguous and clearly conveys the
legislative intent of making the provisions ‘mandatory’. The
provision of Section 16 of the NGT Act, undisputedly has inbuilt
element of consequences. The party loses its right to even
institute an appeal after the prescribed period of limitation and a
duty is cast upon the Tribunal not to permit such institution. As
already stated by us above, the language of Section 16, by
necessary implication excludes the application of the general law
of limitation. Thus, it cannot be said that the language is para
materia to Order VIII Rule 1 and hence the consequences thereof
should be identical.
51
50. The Supreme Court in Kailash Nankhu (supra), while dealing
with the provisions of Order VIII Rule 1 clearly stated that the
provision does not deal with the power of the Court and also does
not specifically take away the power of the Court to take the
written statement on record, though filed beyond the time as
provided for. The nature of the provisions contained in Order VIII
Rule 1 is procedural. It is not a part of the substantive law.
Further, the object behind substituting Order VIII Rule 1 in the
present shape is to curb the mischief of unscrupulous defendants
adopting dilatory tactics, delaying the disposal of cases much to
the chagrin of the plaintiffs, approaching the court for quick relief
and also to the serious inconvenience of the court faced with
frequent prayers for adjournments. The object is to expedite the
hearing and not to scuttle the same (paragraph 27 of the
judgment). In paragraph 28 of the judgment, the Supreme Court
further noticed that in an adversarial system, no party should
ordinarily be denied the opportunity of participating in the
process of justice dispensation, unless compelled by express and
specific language of the statute. The provisions of the Code of
Civil Procedure, 1908, or any other procedural enactment ought
not to be construed in a manner which would leave the court
helpless to meet extraordinary situations in order to achieve the
ends of justice.
51. We may also notice here that the Court in Kailash Nankhu
(supra) specifically dealt with the view expressed by the Supreme
52
Court in the case of Dr. J.J. Merchant and Ors. v. Shrinath
Chaturvedi, (2002) 6 SCC 635, where the Court had taken the
view that proviso to Order VIII Rule 1 should be strictly construed
and adhered to. The Court in the case of Kailash Nankhu (supra)
referred to both Topline Shoes Ltd. v. Corporation Bank, (2002) 6
SCC 33 and Dr. J.J. Merchant (supra). In both these earlier
judgments of the Supreme Court, the Court was concerned with
Section 13(2) of the Consumer Protection Act, 1986, which
required the opposite party to a complaint to give his version of
the case within a period of thirty days or such extended period
not exceeding 15 days as may be granted by the District Forum.
This provision was treated by the Court in the case of Dr. J.J.
Merchant (supra) as para materia to Order VIII Rule 1 of the Civil
Procedure Code, 1908. In the case of Topline Shoes Ltd. (supra),
the Court held the same provision as ‘directory’, while in the case
of J.J. Merchant (supra), it was held to be ‘mandatory’, which view
in relation to interpretation of Order VIII Rule 1 was treated to be
obiter by the Supreme Court in the case of Fairgrowth
Investments Ltd. (supra).
52. The Supreme Court in the case of Topline Shoes Ltd. (supra),
also took the view that Section 13(1)(a) of the Consumer
Protection Act, 1986, need not be construed strictly.
53. From the above discussion, it is clear that provisions of
Order VIII Rule 1 of the Code of Civil Procedure, 1908, do not
53
impose any embargo upon the power of the Court to extend the
time. The provision is in the domain of procedural law and was
held to be ‘directory’ by the Supreme Court. On the contrary, the
provision of Section 16 of the NGT Act is in unambiguous
language and imposes restriction upon the power of Tribunal to
permit even institution of an appeal beyond the prescribed period.
Besides this and for the reasons afore-recorded, the provision has
to be construed as ‘mandatory’.
54. Having dealt with the various aspects of this case and the
rival contentions raised on behalf of the respective parties we are
of the considered view that the provisions of Section 16 of the
NGT Act are unexceptionally ‘mandatory’. The said provision
clearly conveys the legislative intent of excluding the application
of the provisions of the Limitation Act, 1963. Further, with
approval we reiterate the view taken by the Tribunal in the cases
referred supra that this Tribunal has no jurisdiction to condone
the delay beyond the total period of 90 days provided under
Section 16 of the NGT Act. In fact, the Tribunal cannot permit
even institution of an appeal if there is such a delay.
55. Accordingly, we hold that the present appeal is barred by
limitation and the Tribunal has no jurisdiction to condone the
delay of 104 days as prayed. Resultantly, the application for
condonation of delay is dismissed and appeal does not survive for
consideration.
54
56. The appeal and the application are thus dismissed while
leaving the parties to bear their own cost.
Hon’ble Mr. Justice Swatanter Kumar
Chairperson
Hon’ble Mr. Justice M.S. Nambiar
Judicial Member
Hon’ble Dr. D.K. Agrawal
Expert Member
Hon’ble Prof. A.R. Yousuf
Expert Member
Hon’ble Dr. R.C. Trivedi
Expert Member
Dated: July 24, 2014
55